Project

Vandergrift Mill Plant Expansion

New HGBA (Heavy Gauge Bright Annealing) furnace and processing line at an existing building

Location
Vandergrift, PA
Client
ATI
Challenge

Installation of new electrical equipment and a vast network of cable tray to minimize conduit, Ebner vertical annealing furnace system, and various HPL material handling equipment in very congested spaces

Outcome

TWD provided 2 years site support during excavation for electrical grounding, embedded conduit and temporary construction power needs with the installation 2 parallel 6900 V, 2500 kva ABB substations with switchgear, as well as design all above grade field routed conduit and electrical room for switchgear, MCC’s, I/O cabinets, VFD drives, LP’s and DPP’s for the installation of the new HGBA furnace and processing line at an existing building.

Result
6900 V, 2500 kVA Substations
The setup includes two parallel 6900 V, 2500 kVA ABB substations equipped with switchgear.
2
Years site support.
$58M
Total installed cost.