Vandergrift Mill Plant Expansion
New HGBA (Heavy Gauge Bright Annealing) furnace and processing line at an existing building
Installation of new electrical equipment and a vast network of cable tray to minimize conduit, Ebner vertical annealing furnace system, and various HPL material handling equipment in very congested spaces
TWD provided 2 years site support during excavation for electrical grounding, embedded conduit and temporary construction power needs with the installation 2 parallel 6900 V, 2500 kva ABB substations with switchgear, as well as design all above grade field routed conduit and electrical room for switchgear, MCC’s, I/O cabinets, VFD drives, LP’s and DPP’s for the installation of the new HGBA furnace and processing line at an existing building.
Celebrate innovation and unlock new possibilities with TWD.