Project
Marine And Rail Terminal Expansion
The design and upgrade of an existing marine terminal to incorporate fuel rail offloading (32 spots) pipeline, bulk tank storage and marine loading at multiple terminals.
Challenge
Increased the rail offloading rack to 32 railcar positions, allowing 64 railcars to be offloaded per day.Special considerations for environmentally sensitive site located on Canadian Coastal waterways, vapour recovery, marine terminal structural modifications and environmental permitting.
Outcome
TWD completed FEL-1, FEL-2, FEL-3 feasibility studies and EPCM execution (as agent).Project achieved excellent safety performance.
Result
$180MM
Total project cost.
Up to 64 Railcars/day
The rail offloading rack has been expanded to accommodate 32 railcar positions, enabling the offloading of up to 64 railcars per day.
Turnkey Project
TWD completed FEL-1, FEL-2, FEL-3 feasibility studies and EPCM execution.